Edit Template

Hydraulic Workover Units

Workover operations are performed for maintenance purposes to keep production levels up with remedial objectives. This involves retracting and replacing the existing completion string in the reservoir or new production zones. They are mainly carried out on oil or gas producing wells at any stage of their productive life. These oilfield maintenance operations are executed to optimize oil or gas production and maintain it at an optimal level.

Workover Applications:

  • Sand Washing/Well Cleaning
  • Cementing
  • Drill Out/Milling Cement/Sediment
  • Unload Liquid
  • Acidizing/Stimulation
  • Running/Pulling Gas Lift Macaroni
  • ESP Workover/Light Workover
  • Straddle Isolation
  • Fishing

HWU 340K

  • Year Built: 2021
  • Design Code: API 4F compliant
  • Max Pull Capacity: 340,000 lbs
  • Max Snub Capacity: 180,000 lbs
  • Max Stroke: 10 ft
  • Max Bore OD: 14-1/2″
  • Engine Power: 490 hp
  • Gin Pole: 10 ton, 3-section telescopic
  • Gin Pole Length: 11.75 – 22.5 m
  • Tong Arm: SWL 5,500 lbs
  • Rotary Table Max Torque: 22,000 ft.lbs
  • Rotary Table Max Speed: 100 rpm

HWU 600K

  • Year Built : 2011
  • Max Operating Wind Speed : 60 knots
  • Assembly/Disassembly Time : 72 hours
  • Dry Weight (w/o Tubulars) : 104 tonne
  • Tripping Speed : 48 joints/hr (1,500 ft/hr)
  • Jacking Capacity : 660,000 lbs
  • Hook Load Capacity : 30 ft
  • Engine Power : 900 + 800 hp
  • PU Max Hydraulic Pressure : 2 x 5,000 psi
  • Swivel Max Torque : 24,000 ft.lbs
  • Swivel Max Circulating Pressure : 5,000 psi

PT Emneltech Solusi Indonesia

PT Emneltech Solusi Indonesia (Emneltech) is a fully domestic company founded in Indonesia. It’s established in 2020 with the aim to be the top service company in supplying the right technologies and solutions in oil & gas, and also geothermal field.

Our Location

© 2024 emneltech.com All rights reserved.

Scroll to Top